Demolition Process
We are committed to delivering professional work in everything we do.
We prioritize the safety of our customers and neighboring residents, carrying out every task carefully and reliably. Although we take every precaution to prevent accidents, we maintain third-party liability insurance to cover potential incidents during construction. Estimates are free, so please feel free to contact us.
After discussing your specific requirements, we inspect the property, identify items to be removed other than the building itself, and check road conditions to calculate an accurate demolition cost. If underground objects or unexpected work are discovered, we discuss the necessary measures with you and proceed only after obtaining your understanding and approval.
We check the following items:
・Construction area and type of protective sheeting
・Building structure and condition
・Surrounding environment and access routes for equipment and vehicles
・Scope of work
・Property boundaries with neighboring properties
・Underground objects
・Your preferences for the finished ground surface
Demolition work may cause noise and vibration that affect nearby residents. We visit neighboring properties to explain the work, offer our greetings, and provide a small courtesy gift.
We can also arrange a traditional Shinto ground-breaking or purification ceremony upon request.
We then cover the scaffolding with protective and soundproof sheets to reduce dust, debris, and noise, minimizing the impact on neighboring residents.
These include tatami mats, window frames and sashes, insulation materials, doors and fittings, roof tiles, interior fixtures, residential equipment, gypsum boards, and decorative interior wall panels.
We take great care to avoid damaging nearby structures that are not included in the demolition work, such as neighboring block walls.
Once the foundations have been demolished and removed, we carefully level the ground, leaving the site cleared and ready for its next use.
About post-demolition site preparation:
If you plan to use the site as a parking lot, we can spread crushed stone or pave the surface with concrete or asphalt.
Upon request, we can also provide a construction waste manifest, which documents waste disposal and helps clarify how and by which company the waste was transported and processed.